Interior Progress - at Sure Fit, San Leandro, CA

Rear side curtain compartment door not in place, and floors not fitted yet.
|
These two shots were taken
the 27th of November. At left, the front of the tub is now more complete with
the "toe kick" in place. |

December 2. Same shot - but the floors are installed and partially carpeted.The rear side curtain door is on, as is the gas tank..

Again - same angle looking forward into the footwell, and a close up of the driver's side footwell.

Seat back and seat bottoms.
Front shot - note seat rails under the front of the car.
Right door panel is on, left is not.