Interior Progress - at Sure Fit, San Leandro, CA

Rear side curtain compartment door not in place, and floors not fitted yet.

These two shots were taken the 27th of November. At left, the front of the tub is now more complete with the "toe kick" in place.

December 2. Same shot - but the floors are installed and partially carpeted.The rear side curtain door is on, as is the gas tank..

Again - same angle looking forward into the footwell, and a close up of the driver's side footwell.

Seat back and seat bottoms.

Front shot - note seat rails under the front of the car.

Right door panel is on, left is not.